{"id":319,"date":"2015-03-11T11:21:37","date_gmt":"2015-03-11T11:21:37","guid":{"rendered":"https:\/\/www.conditionedair.com\/?p=319"},"modified":"2015-03-11T11:21:37","modified_gmt":"2015-03-11T11:21:37","slug":"the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction","status":"publish","type":"post","link":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/","title":{"rendered":"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction"},"content":{"rendered":"<p><strong>Partner: Professional Building<\/strong> <strong>Systems (PBS)<\/strong><\/p>\n<p>As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan. This 5000 square foot remodeling effort involved four air conditioning units that required the relocation of both AC units and drains.<\/p>\n<p>Job Superintendent, Dennis Lumley, remarked that Conditioned Air was always very flexible in working with necessary changes. In particular, he relayed how Vito DiPalma, the head of our New Construction department, met him on a Saturday to sort out problems. Vito also made sure that the flooring that was delivered sat in an air-conditioned space even before the construction was completed. This involved some real improvisation on Vito\u2019s part. When asked to sum up his experience with Conditioned Air, Dennis said simply, <em>\u201cGreat as ever!\u201d<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Partner: Professional Building Systems (PBS) As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[176],"tags":[],"vertical":[],"segment":[],"service":[],"class_list":["post-319","post","type-post","status-publish","format-standard","hentry","category-case-studies"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Partner: Professional Building Systems (PBS) As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"siteadmin\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Conditioned Air |\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction | Conditioned Air\" \/>\n\t\t<meta property=\"og:description\" content=\"Partner: Professional Building Systems (PBS) As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2015-03-11T11:21:37+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2015-03-11T11:21:37+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction | Conditioned Air\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Partner: Professional Building Systems (PBS) As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan.\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\\\/#article\",\"name\":\"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction | Conditioned Air\",\"headline\":\"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction\",\"author\":{\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/author\\\/siteadmin\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/#organization\"},\"datePublished\":\"2015-03-11T11:21:37-04:00\",\"dateModified\":\"2015-03-11T11:21:37-04:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\\\/#webpage\"},\"articleSection\":\"Case Studies\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/category\\\/case-studies\\\/#listItem\",\"name\":\"Case Studies\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/category\\\/case-studies\\\/#listItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/category\\\/case-studies\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\\\/#listItem\",\"name\":\"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\\\/#listItem\",\"position\":3,\"name\":\"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/category\\\/case-studies\\\/#listItem\",\"name\":\"Case Studies\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/#organization\",\"name\":\"Conditioned Air\",\"url\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/author\\\/siteadmin\\\/#author\",\"url\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/author\\\/siteadmin\\\/\",\"name\":\"siteadmin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a177f1dbbea3f2126aa05cc7f89fbff1e46d7b7e91dca8a524c9e68038b45249?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"siteadmin\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\\\/#webpage\",\"url\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\\\/\",\"name\":\"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction | Conditioned Air\",\"description\":\"Partner: Professional Building Systems (PBS) As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/author\\\/siteadmin\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/author\\\/siteadmin\\\/#author\"},\"datePublished\":\"2015-03-11T11:21:37-04:00\",\"dateModified\":\"2015-03-11T11:21:37-04:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/\",\"name\":\"Conditioned Air\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/conditionedair.imarketbeta.com\\\/blog\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction | Conditioned Air","description":"Partner: Professional Building Systems (PBS) As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan.","canonical_url":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/#article","name":"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction | Conditioned Air","headline":"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction","author":{"@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/author\/siteadmin\/#author"},"publisher":{"@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/#organization"},"datePublished":"2015-03-11T11:21:37-04:00","dateModified":"2015-03-11T11:21:37-04:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/#webpage"},"isPartOf":{"@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/#webpage"},"articleSection":"Case Studies"},{"@type":"BreadcrumbList","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/conditionedair.imarketbeta.com\/blog#listItem","position":1,"name":"Home","item":"https:\/\/conditionedair.imarketbeta.com\/blog","nextItem":{"@type":"ListItem","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/category\/case-studies\/#listItem","name":"Case Studies"}},{"@type":"ListItem","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/category\/case-studies\/#listItem","position":2,"name":"Case Studies","item":"https:\/\/conditionedair.imarketbeta.com\/blog\/category\/case-studies\/","nextItem":{"@type":"ListItem","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/#listItem","name":"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction"},"previousItem":{"@type":"ListItem","@id":"https:\/\/conditionedair.imarketbeta.com\/blog#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/#listItem","position":3,"name":"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction","previousItem":{"@type":"ListItem","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/category\/case-studies\/#listItem","name":"Case Studies"}}]},{"@type":"Organization","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/#organization","name":"Conditioned Air","url":"https:\/\/conditionedair.imarketbeta.com\/blog\/"},{"@type":"Person","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/author\/siteadmin\/#author","url":"https:\/\/conditionedair.imarketbeta.com\/blog\/author\/siteadmin\/","name":"siteadmin","image":{"@type":"ImageObject","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/a177f1dbbea3f2126aa05cc7f89fbff1e46d7b7e91dca8a524c9e68038b45249?s=96&d=mm&r=g","width":96,"height":96,"caption":"siteadmin"}},{"@type":"WebPage","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/#webpage","url":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/","name":"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction | Conditioned Air","description":"Partner: Professional Building Systems (PBS) As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/#website"},"breadcrumb":{"@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/#breadcrumblist"},"author":{"@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/author\/siteadmin\/#author"},"creator":{"@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/author\/siteadmin\/#author"},"datePublished":"2015-03-11T11:21:37-04:00","dateModified":"2015-03-11T11:21:37-04:00"},{"@type":"WebSite","@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/#website","url":"https:\/\/conditionedair.imarketbeta.com\/blog\/","name":"Conditioned Air","inLanguage":"en-US","publisher":{"@id":"https:\/\/conditionedair.imarketbeta.com\/blog\/#organization"}}]},"og:locale":"en_US","og:site_name":"Conditioned Air |","og:type":"article","og:title":"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction | Conditioned Air","og:description":"Partner: Professional Building Systems (PBS) As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan.","og:url":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/","article:published_time":"2015-03-11T11:21:37+00:00","article:modified_time":"2015-03-11T11:21:37+00:00","twitter:card":"summary","twitter:title":"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction | Conditioned Air","twitter:description":"Partner: Professional Building Systems (PBS) As with many relatively complex construction and remodeling projects, the architectural drawings did not match precisely with the actual structure we encountered. We were able to work collaboratively with PBS to make sure that everything was located where it belonged, even when it did not match the original architectural plan."},"aioseo_meta_data":{"post_id":"319","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2026-07-31 14:38:29","updated":"2026-07-31 14:54:51","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/conditionedair.imarketbeta.com\/blog\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/conditionedair.imarketbeta.com\/blog\/category\/case-studies\/\" title=\"Case Studies\">Case Studies<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tThe Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/conditionedair.imarketbeta.com\/blog"},{"label":"Case Studies","link":"https:\/\/conditionedair.imarketbeta.com\/blog\/category\/case-studies\/"},{"label":"The Remodeling of the Timber Ridge Recreational Center That Involved a Significant Amount of New Construction","link":"https:\/\/conditionedair.imarketbeta.com\/blog\/the-remodeling-of-the-timber-ridge-recreational-center-that-involved-a-significant-amount-of-new-construction\/"}],"_links":{"self":[{"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/posts\/319","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/comments?post=319"}],"version-history":[{"count":0,"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/posts\/319\/revisions"}],"wp:attachment":[{"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/media?parent=319"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/categories?post=319"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/tags?post=319"},{"taxonomy":"vertical","embeddable":true,"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/vertical?post=319"},{"taxonomy":"segment","embeddable":true,"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/segment?post=319"},{"taxonomy":"service","embeddable":true,"href":"https:\/\/conditionedair.imarketbeta.com\/blog\/wp-json\/wp\/v2\/service?post=319"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}